South Africa’s Department of Mineral Resources and Petroleum has approved a new prospecting right, PR 10839, for West Wits Mining Ltd through its operating subsidiary, West Wits MLI (Pty) Ltd.
The area surrounds the existing Mining Right (MR 10073) at the Witwatersrand Basin Project (WBP) in Johannesburg and is positioned as a strategic addition to support longer-term expansion around the Qala Shallows development.
Mining Right – MR 10073 (blue); Prospecting Right – PR 10730 (yellow); and Prospecting Right – PR 10839 (red).

PR 10839 provides a depth extension to the Qala Shallows Kimberley Reef orebody beneath MR 10073, adding continuity south of the current mining right boundary.
The new right lies directly to the south of MR 10073 and also extends eastward from PR 10730, which was granted in December 2024. The expanded prospecting footprint is expected to support the planned Stage 4 Qala Deeps project within the broader WBP.
The existing global mineral resource estimate for the WBP totals 5.025 Moz of gold at an average grade of 4.66 g/t.